Skip to main content

Practice

Cases

Project notes written as method explanations, focused on process, state design and responsibility boundaries. Client names and operating data are not disclosed without written authorisation.

01

Notes

What we learned on recent projects

Each note has an English summary; the full original is published in Chinese and linked from each page.

11notes

Project notes recording the trade-offs made during delivery

3topics

Systems integration · Business systems · Delivery approach

2020–2025

Span of the notes, covering every stage of the company

0names

Client names are not published without written authorisation

  1. 2025.09

    Migrating a legacy system: moving the data is the easy part

    The hard part is deciding which data comes across, under which definition, and what happens to the records that do not survive the trip.

    Systems integration
  2. 2025.04

    Service delivery: every step from dispatch to customer sign-off should leave a record

    Disputes in field service rarely come from the outcome. They come from a process with no record, where responsibility has to be rebuilt from memory.

    Business systems
  3. 2024.10

    Workshop reporting: scanning is not the hard part

    Resistance to shop-floor systems usually comes from piece-rate pay and responsibility, not from the scanning gesture itself.

    Business systems
  4. 2024.06

    Why one complete workflow beats launching every module at once

    Phased delivery works when the first phase actually runs end to end, not when the scope shrinks but every part stays half-finished.

    Delivery approach
  5. 2023.11

    Write the field mapping before integration starts

    Integration delays usually come from mismatched field definitions. A mapping table both sides can check saves a lot of back-and-forth.

    Systems integration
  6. 2023.05

    Returns and countersigning in approval flows

    A return is not a resubmission, and countersigning is not just one more viewer. Separate states, rights and records to keep the chain traceable.

    Business systems
  7. 2022.11

    Four layers of pricing behind a single quotation

    Discounts everywhere are usually not a discipline problem. They are a sign that pricing was never fully defined in the system.

    Business systems
  8. 2022.07

    From spreadsheets to a system: designing document states

    A state machine is not about the screen. Its value is that every transition has an owner, a timestamp and a traceable record.

    Business systems
  9. 2021.09

    Chain stores: when master data disagrees, every report downstream is suspect

    Inconsistent store, product and price definitions rarely show up in reports. They surface during stock counts, price changes and reconciliation.

    Business systems
  10. 2021.05

    Repairs and inspections: two flows that should not share one work order

    Repairs are reactive, inspections are planned. Merged into one table, both sets of metrics drift.

    Business systems
  11. 2020.08

    Inventory deduction: settle the rules before writing code

    Negative stock is a rules problem, not a coding problem. Define when stock is deducted, how it is reserved and how differences are handled.

    Business systems

Facing a similar workflow problem?

Describe your industry and scenario. We will share the relevant approach rather than a generic template.