Skip to main content

Business systems

Repairs and inspections: two flows that should not share one work order

Repairs are reactive, inspections are planned. Merged into one table, both sets of metrics drift.

English summary. The full project note is published in Chinese.

Two different things

A repair request is raised by a tenant and measured by response time, graded by urgency. An inspection is generated from a plan and measured by coverage and frequency, with most results simply "normal". One is externally triggered and time-based; the other is internally planned and coverage-based.

The cost of merging

Inspection orders are numerous and closed quickly, which pulls the average response time down and makes service look better than it is. Missed inspections never appear in any report, because a skipped visit produces no record at all.

Design points

Separate tables and separate metrics, shared staff, spare parts and knowledge base. An abnormal inspection result creates a linked repair order that records the source point, so the same issue is not reported twice without connection. Reminders follow their own rules and go to different people.

The outcome

Response time, inspection completion and abnormal-conversion rate could finally be read separately, which was the first time management could see where staffing should shift.

Read the full note in Chinese

Does this resemble a problem you are facing?

Describe your current process and systems. We will give an initial view on scope and delivery order.